Impact evaluation study of the project intensification and expansion of distribution system of 18 palli bidyut Samitee (PBS) 2nd phase (revised) /

By: Bangladesh Ministry of Planning.Government of the People's Republic of BangladeshContributor(s): Bangladesh Ministry of PlanningMaterial type: TextTextPublication details: Dhaka : Ministry of Planning, 2011. Description: vii, 134. (vatious pagings) : ill. ; 28 cmSubject(s): Electric power distributionDDC classification: 621.319
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Notes Date due Barcode
Books Books Bangladesh Public Administration Training Centre Library
621.319 BAI 2011 (Browse shelf(Opens below)) Available G5139
Books Books Bangladesh Public Administration Training Centre Library
General Reading Room
621.319 BAI 2011 (Browse shelf(Opens below)) Available mizan G5137

There are no comments on this title.

to post a comment.

Powered by Koha