Amazon cover image
Image from Amazon.com

Estimating construction costs and schedules : experience with power generation projects in developing countries / Robert W. Bacon, John E. Besant-Jones and Jamshid Heidarian.

By: Bacon, Robert, 1942-Contributor(s): Besant-Jones, John, 1941- | Heidarian, JamshidMaterial type: TextTextSeries: World Bank technical paper ; no. 325. | World Bank technical paper. Energy series.Publication details: Washington, D.C. : World Bank, c1996. Description: xv, 120 p. : ill. ; 28 cmISBN: 0821336703Subject(s): Electric power-plants -- Design and construction -- Estimates -- Developing countries | Electric power-plants -- Developing countries -- Costs -- StatisticsDDC classification: 621.3121 LOC classification: TK1193.D44 | B33 1996
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Notes Date due Barcode
Books Books Bangladesh Public Administration Training Centre Library
General Reading Room
621.3121 WOE 1996 (Browse shelf(Opens below)) Available Zahid WB7066

Includes bibliographical references (p. 119-120).

There are no comments on this title.

to post a comment.

Powered by Koha