Impact evaluation study of Jamuna-Meghna River Erosion Mitigation Project (JMREMP) / study team, Md. Abdul Quiyum, director, IMED [and five others] ; overall supervision, Syed Md. Haider Ali, director general, Evaluation Sector, IMED.

By: Abdul Quiyum, Md [author.]Contributor(s): Bangladesh. Bāstabāẏana Paribīkshaṇa o Mulyāẏana Bibhāga. Evaluation Wing | Jamuna-Meghna River Erosion Mitigation ProjectMaterial type: TextTextLanguage: English, Bengali Publication details: Dhaka: Jamuna-Meghna River Erosion Mitigation Project (JMREMP), 2013 Description: xviii, 138 pages : color illustrations ; 29 cmSubject(s): Water-supply -- Bangladesh | Soil erosion -- Economic aspects -- Bangladesh | Soil erosion prediction -- Bangladesh -- Jamuna RiverDDC classification: 333.987
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Notes Date due Barcode
Books Books Bangladesh Public Administration Training Centre Library
General Reading Room
333.987 BAI 2013 (Browse shelf(Opens below)) Available mizan G5195

Includes statistical tables.

There are no comments on this title.

to post a comment.

Powered by Koha