000 00926cam a2200265 a 4500
005 20181210010526.0
008 960314s1996 nyua 001 0 eng
020 _a0824797159 (alk. paper)
040 _aDLC
_cDLC
_dBD-DhBPA
082 0 0 _a658.404
_bEFF 1996
245 2 0 _aEffective project management through applied cost and schedule control /
_cedited by James A. Bent, Kenneth K. Humphreys.
260 _aNew York :
_bM. Dekker,
_cc1996.
300 _axvi, 456 p. :
_bill. ;
_c29 cm.
490 1 _aCost engineering ;
_v26
500 _aIncludes index.
590 _amizan
650 0 _aEngineering economy.
_969441
650 0 _aProject management.
_969442
650 0 _aCost control.
_969443
650 0 _aProduction scheduling.
_969444
700 1 _aBent, James A.,
_d1931-
_969445
700 1 _aHumphreys, Kenneth King.
_969446
830 0 _aCost engineering (Marcel Dekker, Inc.) ;
_v26.
_952400
942 _2ddc
_cBK
999 _c24208
_d24208