000 | 01143nam a2200277 a 4500 | ||
---|---|---|---|
005 | 20181210064035.0 | ||
008 | 940713s1994 dcua b i001 0 eng | ||
010 | _a 93037219 | ||
020 | _a0821326775 | ||
040 |
_aDLC _cDLC _dBD-DhBPA |
||
050 | 0 | 0 |
_aTL151.5 _b.A73 1994 |
082 | 0 | 0 |
_a629.275 _220 _bWOE 1994 |
100 | 2 |
_aArchondo-Callao, Rodrigo _d1959- _994032 |
|
245 | 1 | 0 |
_aEstimating vehicle operating costs / _cRodrigo S. Archondo-Callao and Asif Faiz. |
260 |
_aWashington, D.C. : _bWorld Bank, _cc1994. |
||
300 |
_aix, 83 p. : _bill. ; _c28 cm. + |
||
300 | _e1 computer disk (3 1/2 in.). | ||
440 | 0 |
_aWorld Bank technical paper ; _vno. 234 _994033 |
|
500 | _aSystem requirements for computer disk: IBM XT, AT, or compatible PC with 386 microprocessor or greater; 520K RAM; DOS 3.0 or higher; floppy disk drive; printer capable of printing 102 characters per line. | ||
504 | _aIncludes bibliographical references (p. 29) and index. | ||
590 | _aZahid | ||
650 | 0 |
_aMotor vehicles _xCost of operation _xData processing. _956745 |
|
700 | 1 |
_aFaiz, Asif. _994034 |
|
710 | 2 |
_aWorld Bank. _994035 |
|
942 |
_2ddc _cBK |
||
999 |
_c32888 _d32888 |